Terrebonne, QC

Building permits in Terrebonne

Terrebonne uses a declaration-of-work process for many residential interior and exterior renovations.

Official sources checked Sep. 24, 2026

Permit rules by project

Pick the project that matches your work. These are starting rules for Terrebonne; property-specific zoning, heritage and trade approvals can still apply.

Decks

Depends on scope

Terrebonne states that no permit is required for a balcony/gallery, but a mandatory declaration of work and supporting documents are required, with PIIA and hazard-area exceptions.

Sheds & accessory buildings

Depends on scope

Terrebonne requires a declaration of work for a shed/cabanon rather than a standard permit, with a maximum shed area of 19 m² and property/PIIA exceptions.

Basement renovations

Depends on scope

Terrebonne routes residential building transformations without expansion through its P-19 process; basement work can also intersect accessory-dwelling, structural and PIIA rules.

Secondary suites & ADUs

Permit required

Terrebonne states that a permit is required to construct an accessory dwelling unit under its current accessory-dwelling rules.

Interior alterations

Depends on scope

Terrebonne routes transformation of a principal residential building without expansion through the P-19 process; the exact permit/declaration path depends on the renovation scope.

Walls / structural work

Depends on scope

Structural residential transformations in Terrebonne follow the applicable building/transformation permit route and can require plans or professional review depending on scope.

Pools / hot tubs

Depends on scope

Terrebonne requires a permit to install or replace a residential swimming pool. Spas can follow different declaration/permit rules, so the combined pool/hot-tub result remains conditional.

Garages / carports

Depends on scope

Terrebonne regulates detached garages and other accessory structures through specific municipal permit/declaration routes; the exact path varies by structure and project.

Plumbing / HVAC

Confirm with city

Terrebonne does not publish one combined permit rule for every residential plumbing or HVAC project. Confirm the trade work and any related building authorization with the municipality.

Fences

Depends on scope

Terrebonne states that no permit is required for an ordinary fence, hedge or low wall, but a permit is required for a safety enclosure controlling access to a pool.

Retaining walls

Check size / scope

Terrebonne requires a certificate to construct a retaining wall and defines a retaining wall under the zoning rule as an installation at least 1 m high.

Demolition

Depends on scope

Terrebonne requires a C-13 permit path and, where applicable, demolition-committee authorization for a principal building; accessory-building demolition instead uses a declaration of work.

Apply or ask Terrebonne

Use the municipality’s permit office for current forms, fees, drawings and questions about your property.

Terrebonne Direction de l’urbanisme durable

Address
790 rue Saint-Pierre, Terrebonne, QC J6W 1E4
Contact the permit office ↗

Your application route

Open the official permit page ↗

Use the official permit page to confirm project requirements, forms, fees and the current application process.

Other approvals

Terrebonne administers municipal permits/certificates and zoning. Regulated electrical/plumbing/heating/gas trade work also sits within Québec’s provincial contractor-licensing framework, so municipal authorization is not the only compliance layer. Province/authority source ↗

Good to know in Terrebonne

  • Other projects, including additions or specified transformations, use separate application forms and can also be affected by PIIA, heritage or other urban-planning approvals.
  • Quebec permit terminology and process can vary by municipality—and in Montréal, by borough. Keep the project description precise and check whether the work calls for a permit, certificate, declaration or provincial trade requirement.

Official sources

Use these official links to confirm the current rule for your Terrebonne property.

View 1 official source

Sources checked Sep. 24, 2026. Requirements can change; the municipality makes the final permit decision.

Need a different city?

Search another Canadian municipality.