Depends on scopeToronto requires a building permit for a deck more than 0.60 m above grade; attached/enclosed deck work and other material alterations can also trigger a permit. Low uncovered platforms can qualify for the published exemption.
Toronto, ON
Toronto says a building permit is required under the Building Code Act for most construction, demolition, additions and major renovations.
Official sources checked Sep. 28, 2026
Pick the project that matches your work. These are starting rules for Toronto; property-specific zoning, heritage and trade approvals can still apply.
Toronto requires a building permit for a deck more than 0.60 m above grade; attached/enclosed deck work and other material alterations can also trigger a permit. Low uncovered platforms can qualify for the published exemption.
Toronto’s current page contains conflicting boundary wording at exactly 15 m²: one section lists 15 m² or more among permit examples while the exemption section says a qualifying shed not more than 15 m² can be exempt.
Because the City’s wording conflicts at exactly 15 m², confirm that boundary case with the City. A smaller shed can fit the exemption only when it is one storey, detached, storage-only and has no plumbing.
Toronto allows a narrow no-building-permit path for finishing a house basement only when there is no structural/material alteration, no additional dwelling unit and no new plumbing; otherwise a permit can be required.
Toronto identifies adding a second suite and changing a single dwelling to a multi-dwelling house as work requiring a building permit.
Toronto lists construction of an addition to an existing building among projects that require a building permit.
Toronto requires a permit for material interior alterations such as adding or removing walls or changing openings, while cabinetry, millwork and other listed cosmetic work can be exempt.
Toronto lists structural or material alterations such as adding/removing walls or creating, enlarging or relocating openings among work requiring a building permit.
Toronto uses a separate Pool Fence Enclosure permit route for outdoor pools. The enclosure application requires a zoning certificate first; the pool structure may have additional requirements.
Toronto requires a building permit for an accessory structure such as a detached garage, workshop, carport or pool house when it is over 10 m², and for an attached or plumbed accessory structure regardless of size.
Toronto lists installing or modifying heating and plumbing systems among work that requires permits; the exact building, plumbing, HVAC or other trade path depends on the work.
Toronto regulates fence height, location and construction through its Fence By-law. The City has a current official fence route, but its published material does not give one building-permit answer for every fence. Pool enclosures follow a separate permit process.
Toronto publishes a no-building-permit condition for a retaining wall on private property, not accessible to the public and less than 1 m high at every location; public-facing or taller walls can require a permit.
Toronto lists demolition or removal of all or part of a building among projects that require a permit.
Use the municipality’s permit office for current forms, fees, drawings and questions about your property.
Choose the guide for your project, then use its Apply Online option.
Use these official links to confirm the current rule for your Toronto property.
Sources checked Sep. 28, 2026. Requirements can change; the municipality makes the final permit decision.