Pick the project that matches your work. These are starting rules for Ottawa; property-specific zoning, heritage and trade approvals can still apply.
Decks
Depends on scopeOttawa requires a permit for an attached/adjacent deck more than 600 mm above grade, an elevated deck providing principal access, or an independent deck over 10 m² that is also more than 600 mm above grade; zoning rules still apply.
Sheds & accessory buildings
Check size / scopeOttawa exempts a one-storey detached storage shed of 15 m² or less when it is ancillary to the principal building and has no plumbing. Other detached accessory structures under 10 m² can also qualify for an exemption.
Basement renovations
Permit requiredOttawa provides a building-permit application route for finishing a basement, with construction drawings and permit documentation required for the project.
Secondary suites & ADUs
Depends on scopeOttawa additional-dwelling-unit work can require a building permit and, depending on the scope, separate plumbing or other approvals.
Home additions
Permit requiredOttawa states that additions and structural alterations are building-permit projects under the Building Code Act.
Interior alterations
Depends on scopeOttawa requires permits for material interior alterations such as adding/removing walls and changing openings; listed cosmetic work can be exempt.
Walls / structural work
Permit requiredOttawa explicitly lists structural repairs or alterations, foundation repairs and wall/opening changes among building-permit projects.
Pools / hot tubs
Permit requiredOttawa requires a Pool Enclosure Permit for a privately owned outdoor pool, pond or hot tub capable of retaining 600 mm or more of water, even where an existing fence or lockable hot-tub lid is present.
Garages / carports
Depends on scopeOttawa exempts a detached accessory structure under 10 m² from a building permit, subject to applicable law; larger garages/accessory buildings follow the permit route. Attached structures are treated differently.
Plumbing / HVAC
Depends on scopeOttawa lists alterations, additions or extensions to a plumbing system as permit work, except replacing existing fixtures; other trade work can follow separate regulatory routes.
Fences
No building permitOttawa explicitly says a building permit is not required to build or replace an ordinary fence. A fence used as a pool enclosure requires a Pool Enclosure Permit and all fences must comply with the Fence By-law.
Retaining walls
Confirm with cityConfirm the wall’s height, loading, location and property-specific requirements with Building Code Services.
Demolition
Permit requiredOttawa requires a building permit to relocate or demolish an existing building or structure, with limited exceptions such as certain barns/silos and non-load-bearing interior partitions.