Decks
Depends on scopeMarkham says decks less than 600 mm (24 in) above existing grade at all locations do not need a building permit; raised decks above that threshold are listed as permit work.
Markham, ON
Markham says a building permit is needed before starting most construction, demolition or renovation projects, subject to listed exceptions.
Official sources checked Sep. 28, 2026
Pick the project that matches your work. These are starting rules for Markham; property-specific zoning, heritage and trade approvals can still apply.
Markham says decks less than 600 mm (24 in) above existing grade at all locations do not need a building permit; raised decks above that threshold are listed as permit work.
Markham states that a detached single-storey accessory building with no plumbing and less than 15 m² does not need a building permit.
Markham lists renovating a dwelling to provide a full basement and constructing separate rooms in a basement among work requiring a building permit.
Markham states that a building permit is required for new construction creating a second suite, followed by inspections/registration requirements.
Markham lists any addition to an existing building, irrespective of size, among projects requiring a building permit.
Markham lists both structural and non-load-bearing partition alterations among permit work, while cupboards, painting and like-for-like maintenance/replacements can be exempt.
Markham lists adding, removing or altering a structural wall or column among work requiring a building permit.
Markham requires a swimming-pool enclosure permit before beginning work for pools in which the water depth can exceed 0.6 m.
Markham lists detached or attached garages and carports among projects requiring a building permit, subject to the published small-accessory-building exemptions.
Markham requires permits for new plumbing piping and specified mechanical work, while some replacements/maintenance and electrical work follow different approval paths.
Markham lists fences other than a pool-enclosure fence as work that does not need a building permit; the Fence By-law still applies.
Markham lists retaining walls less than 1 m high as not requiring a building permit; taller walls require Building Standards review.
Markham requires a demolition permit where a building footprint will be decreased; the permit-process page specifically lists demolition of buildings greater than 10 m² as permit work.
Use the municipality’s permit office for current forms, fees, drawings and questions about your property.
Follow Markham’s permit process to confirm requirements and submit the application for your project.
Use these official links to confirm the current rule for your Markham property.
Sources checked Sep. 28, 2026. Requirements can change; the municipality makes the final permit decision.
Search another Canadian municipality.