Decks
Confirm with cityCambridge’s current building-permit page does not publish one citywide deck height/area rule that applies to every property. Confirm deck attachment, height, cover and zoning with Building Services.
Cambridge, ON
Cambridge says structures larger than 10 m² or structures containing plumbing are among projects that can require a building permit.
Official sources checked Sep. 24, 2026
Pick the project that matches your work. These are starting rules for Cambridge; property-specific zoning, heritage and trade approvals can still apply.
Cambridge’s current building-permit page does not publish one citywide deck height/area rule that applies to every property. Confirm deck attachment, height, cover and zoning with Building Services.
Cambridge exempts a detached accessory structure 15 m² or smaller when it is one storey, storage-only and has no plumbing; projects outside those conditions require permit confirmation.
Cambridge requires permits for structural interior alterations, wall changes, plumbing/drains and other regulated work; a basement project therefore depends on the exact renovation scope.
Cambridge states that new Additional Residential Units must be constructed with a building permit and receive City occupancy approval.
Cambridge’s building-permit rules require approval for new construction that enlarges or adds regulated building area; a residential addition follows the building-permit process.
Cambridge requires permits for wall changes, enlarged openings, structural alterations and plumbing/drain work, while cosmetic work and several like-for-like replacements are listed as no-permit projects.
Cambridge explicitly lists interior structural alterations and adding/removing walls among projects requiring a building permit.
Cambridge requires a municipal pool/hot-tub permit before installing any pool or hot tub capable of a water depth of 76.2 cm (30 in) or more; shallower configurations need confirmation under the bylaw.
Cambridge lists attached or detached garages, sheds and carports as typical permit projects, while a narrow detached one-storey storage exemption can apply to qualifying small accessory structures.
Cambridge lists plumbing, drains and water/storm/sanitary service work as permit work, while some same-system replacements such as an existing forced-air furnace or added heat pump/AC can be exempt.
Cambridge states that ordinary fences do not require a building permit, except swimming-pool enclosures, which follow the pool/fence permit route.
Cambridge lists retaining walls greater than 1 m as permit work depending on location.
Cambridge requires demolition-control approval for removal of legal residential dwelling units in applicable cases, while other demolition follows the standard demolition-permit route. The exact path depends on what is being removed.
Use the municipality’s permit office for current forms, fees, drawings and questions about your property.
Use the official permit page to confirm project requirements, forms, fees and the current application process.
Use these official links to confirm the current rule for your Cambridge property.
Sources checked Sep. 24, 2026. Requirements can change; the municipality makes the final permit decision.
Search another Canadian municipality.