Burlington, ON

Building permits in Burlington

Burlington says interior or exterior renovations and additions may require a building permit; additions require a permit before construction begins.

Official sources checked Sep. 24, 2026

Permit rules by project

Pick the project that matches your work. These are starting rules for Burlington; property-specific zoning, heritage and trade approvals can still apply.

Sheds & accessory buildings

Check size / scope

Burlington requires a permit for an accessory building bigger than 15 m², taller than one storey, attached to another building/structure, or containing plumbing.

Basement renovations

Confirm with city

Burlington routes residential renovations through pre-building/permit review. does not treat every basement project as the same because scope and applicable-law approvals can differ.

Secondary suites & ADUs

Permit required

Burlington states that an additional residential unit requires a building permit for the renovation/addition or accessory building used to create it.

Interior alterations

Depends on scope

Burlington’s general rule is that construction related to a building/structure requires a permit unless an exemption applies; cosmetic work and specified like-for-like replacements are exempt.

Walls / structural work

Permit required

Burlington states that building/structure construction requires a permit except for specified exemptions; structural alteration is not one of the listed cosmetic/like-for-like exemptions.

Garages / carports

Depends on scope

Burlington exempts qualifying one-storey detached garages/carports under 15 m² with no plumbing; larger, attached, taller or plumbed structures require a building permit.

Plumbing / HVAC

Depends on scope

Burlington exempts same-type same-location plumbing fixture replacement and like-for-like heating/cooling replacements for a house; new or altered systems can require permits.

Fences

Depends on scope

Burlington lists ordinary fences as not requiring a building permit, but a fence enclosing a pool, swim spa or hot tub may require a pool-enclosure permit.

Apply or ask Burlington

Use the municipality’s permit office for current forms, fees, drawings and questions about your property.

Your application route

Open the official permit page ↗

Use the official permit page to confirm project requirements, forms, fees and the current application process.

Other approvals

Burlington handles the municipal building/plumbing layer. Electrical work is normally a separate ESA notification/inspection stream, and gas/fuels work is regulated through TSSA/authorized fuels contractors. A building permit does not replace those trade approvals. Province/authority source ↗

Good to know in Burlington

  • For many residential projects, Burlington uses a pre-building approval process that checks matters such as zoning, grading and drainage before the building-permit stage.
  • Residential projects in that process include decks, accessory structures, house renovations, new houses and additional residential units.
  • Interior renovation and addition applications use project-specific checklists; additions require a building permit before construction.
  • Burlington accepts the Pre-Building Approval submission online and does not accept hard-copy submissions for that review.

Official sources

Use these official links to confirm the current rule for your Burlington property.

View 7 official sources

Sources checked Sep. 24, 2026. Requirements can change; the municipality makes the final permit decision.

Need a different city?

Search another Canadian municipality.