Moncton, NB

Building permits in Moncton

Moncton says new construction, home additions, changes of use and renovations require building and development permits.

Official sources checked Sep. 24, 2026

Permit rules by project

Pick the project that matches your work. These are starting rules for Moncton; property-specific zoning, heritage and trade approvals can still apply.

Decks

Permit required

Moncton requires a Building and Development Permit for an exterior deck/stairs when attached to the main building, used as access to a door, or intended for public congregation; detached accessory-style decks still require a development approval route.

Sheds & accessory buildings

Depends on scope

Moncton requires a Development Permit before building, placing or modifying a residential accessory building of 55 m² or less; larger accessory buildings can require additional building approval.

Basement renovations

Depends on scope

Moncton states that construction and renovation projects require building/development permits. Minor finish work and larger basement alterations should be confirmed by scope.

Secondary suites & ADUs

Permit required

Moncton publishes a dedicated checklist for creating a secondary suite and routes the work through its building/development permit process.

Home additions

Permit required

Moncton publishes a dedicated building/development permit checklist for additions and renovations to single-unit, two-unit and semi-detached dwellings.

Interior alterations

Depends on scope

Moncton requires permits for construction and renovation projects, but the permit need for minor interior work depends on the scope.

Pools / hot tubs

Depends on scope

Moncton requires a Development Permit before installing a swimming pool or swim spa able to contain more than 1 metre of water; the enclosure is included in that permit.

Garages / carports

Permit required

Moncton requires municipal approval for residential accessory buildings such as detached garages; the exact building-versus-development permit mix depends on size and scope.

Plumbing / HVAC

Depends on scope

Moncton explicitly requires a plumbing permit for all plumbing work. HVAC/mechanical requirements depend on the work, so the combined trade category remains conditional.

Retaining walls

Confirm with city

Moncton’s current building/development permit page does not publish one residential retaining-wall threshold that applies to every property.

Demolition

Permit required

Moncton’s current fee and permit material includes both demolition permits and development permits for demolition of a building or structure.

Apply or ask Moncton

Use the municipality’s permit office for current forms, fees, drawings and questions about your property.

Moncton Planning & Development

Address
655 Main Street, Moncton, NB E1C 1E8
Contact the permit office ↗

Your application route

Open the official permit page ↗

Use the official permit page to confirm project requirements, forms, fees and the current application process.

Other approvals

Moncton handles the building-permit/inspection layer. Electrical wiring permits are processed through the provincial/NB Power system and inspections through Technical Inspection Services; gas and other technical-safety work can require separate provincial approval. Province/authority source ↗

Good to know in Moncton

  • The city’s Planning and Development Department issues building permits within Moncton.
  • In New Brunswick, municipal building or development approval may sit alongside code and safety requirements, so the full project route should be confirmed.

Official sources

Use these official links to confirm the current rule for your Moncton property.

View 1 official source

Sources checked Sep. 24, 2026. Requirements can change; the municipality makes the final permit decision.

Need a different city?

Search another Canadian municipality.