Pick the project that matches your work. These are starting rules for Winnipeg; property-specific zoning, heritage and trade approvals can still apply.
Decks
Depends on scopeWinnipeg publishes a dedicated deck permit route. An open deck under 600 mm high is listed as no-building-permit work, while larger/elevated decks can require building and/or development permits depending on area, yard and height.
Sheds & accessory buildings
Check size / scopeWinnipeg requires a building permit for detached garages and accessory structures greater than 10 m²; smaller detached accessory structures are listed among projects that do not need a building permit, subject to zoning and other approvals.
Basement renovations
Permit requiredWinnipeg lists basement/lower-level development as a residential building-permit project and provides a dedicated permit application route.
Secondary suites & ADUs
Depends on scopeWinnipeg secondary suites require review through development/building approvals; detached secondary suites have a development-permit process and detailed zoning/building requirements.
Home additions
Permit requiredWinnipeg explicitly states that all house additions and attached garages need both a development permit and a building permit.
Interior alterations
Depends on scopeWinnipeg requires permits for renovations and alterations, while listed cosmetic interior work such as painting, patching, decorating and cabinet/shelf installation does not need a permit.
Walls / structural work
Permit requiredWinnipeg routes structural alterations and foundation repairs through residential building permits; the exact drawings and engineering depend on the work.
Pools / hot tubs
Depends on scopeWinnipeg requires a building permit for outdoor pools, hot tubs/spas and structures capable of holding 600 mm or more of water; seasonal pools/hot tubs are a published exception but still must meet fencing and other rules.
Garages / carports
Depends on scopeWinnipeg requires a building permit for detached garages/accessory structures over 10 m²; attached garages are treated as additions and require development and building permits.
Plumbing / HVAC
Depends on scopeWinnipeg has separate electrical and plumbing trade permits; regulated system changes require the applicable trade permit even where the building project follows another permit route.
Fences
No building permitWinnipeg lists fences for single- and two-family dwellings among projects that do not need a building permit; zoning and other applicable rules still apply.
Retaining walls
Confirm with cityConfirm engineering, grading, zoning and permit requirements for the site.
Demolition
Depends on scopeWinnipeg requires a demolition permit to demolish a building/structure or part of one, with an exemption for detached accessory structures under 10 m². Interior component removal is treated separately from demolition.